It takes about 5 months for the first floor and another 1.5 months for every floor beyond that. Duration also varies depending upon the built up area, location, design complexity etc.
4squarehomes assists the clients with the documentation part for the loan approval process. We have also partnered with a couple of banks and NBFCs for attractive interest rates.
Construction cost of a house majorly depends upon the Super built-up area, Open area( ie Balcony, Utility), Quality of Construction material, and Interiors. 4squarehomes provides various packages at different prices to suit your needs.
Built-up Area is the sum of carpet area plus the area covered by the balcony, terrace, and other utility as well.
The Super built-up area is the total sum of the built-up area and space occupied by common areas like lobby, staircase, elevator, shafts, clubhouse. This is often referred to as a saleable area.